AOC Wind Turbine
AEI personnel installed this Seaforth AOC wind turbine in the summer of 2012. A grant from SECO and the ARRA funded this turbine
installation. Seaforth energy also provided a generous discount to assist with this project. The turbine is installed next to the university
cattle feed mill and should offset the cost of running this feed mill over a yearly basis.
We are currently taking power production data which is publicly available at the following location:
https://www.hobolink.com/p/560035f59e0b8359fbb6e5ca85f89de4
We are currently analyzing the data in regards to production compared to feed mill power usage.
Check back at this page at a future date for additional examined data and production data.
For questions contact David Carr at
dcarr@wtamu.edu
http://seaforthenergy.com/